Grand Island, Neb. — Work was set to begin Monday, April 13 on U.S. Highway 30 (US-30), from reference post 319.00 at Grand Island to reference post 327.00 at Chapman, according to the Nebraska Department of Transportation.
Werner Construction, of Hastings, is the contractor for the project. Work includes widening existing roadway surface at two intersections for left-turn lanes, milling and resurfacing the road and
shoulder with asphalt, full-depth reconstruction of 4 to 2 lane transition area, and lighting and culvert
work.
Traffic will be maintained with lane restrictions and a pilot car and flaggers. An 11-foot width restriction will be in effect. Anticipated completion is Nov. 2026.
Motorists are reminded to drive cautiously in and near work zones, to buckle up, and put phones down.











